When do we Drill Relief Wells

  • Last Line of Defense

Relief Well Delivery Process

How Important is Well Intercept Design?

Relief Well Intersection Process

  • Intercept depth(s)
  • Constraints on relief well surface location(s)
  • Target and adjacent well position uncertainties
  • Hydraulic communication method(s)
  • Target ranging strategy
  • Subsurface drilling and well control hazards
  • Relief well(s) trajectories
  • Casing design
  • Drilling program
  • Kill program integration

Step 1 - Define the Blowout Scenario

  • Well Location South China Sea, January
  • Exploration Well (unknown reservoir)
  • Blowout to Seabed in 260m MSL
  • Flowpath inside open 9‐7/8” Casing
  • Drilled from moored Semi
  • Gyro survey to 20”, MWD to TD
  • Temperature at top of reservoir 160°C
  • Reservoirs:  3x Sandstone – 11,500 psi
  • Drilling MW = 2.05 sg (17.1 ppg)
  • No adjacent wells < 1000m
  • 60 days since spud
  • Subsea cap and contain SIMOPS

....