Overview:

Advantages of an Industry-wide Standard
     – Enhanced interoperability among project participants
     – Reduction of risks due to:
            • Miscommunication
            • Different terminologies
            • Different methods of calculating risk

 

The Challenge of Collaboration

- No industry-wide anticollision standard

- Different standards define risk differently
        – Differ in methods for evaluating/reducing risk
        – Differ in amount of risk deemed acceptable

- A hybrid approach requires
        – Careful planning
        – Integration/bridging of methodologies
        – Effective communication
        – Team work

 

Case Study Offshore Qatar

- Different databases, software
      – Contractor – proprietary software
      – Operator – commercial software

- Advantage in catching potential errors
      – Incorrect survey entered
      – Missing survey
      – Incorrect sidetrack point
      – Incorrect rotary table elevation
      – Incorrect survey tool model assigned

- Resolving Differences in Anticollision Standards
      – Extensive pre-job planning to identify potential issues
      – Established plan to meet both companies’ standards
      – Followed both company and operator’s rules for exemptions
      – Independent calculations performed throughout execution
      – No actions that would pose HSE risks

 

....

View the entire Presentation:

Anti-collision and Risk Management Offshore Qatar

 

Simon McCulloch - SPE, Maersk Oil Qatar
Benny Poedjono, Erhan Isevcan, John Walker - SPE, Schlumberger

 

More from Meeting 32